Product · Alarm

One alarm. The whole context.

One alarm shown with its consequence, who is affected, the work planned this week, the rehearsed response and the prepared steps. One approval. A person decides. It starts on exported alarm logs, before any console connection.

In designDesigned from existing building blocks. Not built.
1

Floods found in exported alarm logs (10 or more alarms in 10 minutes per operator)

2

Monthly off-scan, inhibited, forced review

3

Consequence first; prepared steps; one approval

Needs

  • Alarm-log exports to start
  • Later: a read-only journal replica
  • Impact and Program for the context

Is not

  • Not a detector
  • Not a rationalisation suite
  • Never writes to SCADA or DCS
Where it stops
Not Explain, not Decide. Wavepin Explain names the physical cause of one pipeline alarm where a line model exists; otherwise the alarm text stands. Wavepin Decide simulates line responses. Alarm joins any alarm to consequence, planned work and the rehearsed response.

Built from

What exists, what does not
The incident twin and its one-alarm-with-the-whole-context flow (telecom harness, separate codebase), recorded from real MCP calls: read, what-if, refuse, dry run. The harness session over MCP. Structural-break detection for floods. Wavepin's hypothesis engine, typed decision and deterministic safety validator; the read-only adapter framework; per-step receipts for the shift view. Not built: alarm-journal and historian adapters, the consequence and planned-work inputs, the oil and gas drill library. The shift-handover view (the 192.631(b)(4) / 195.446(b)(4) shift-change record assembled from receipts plus one SCADA export) follows on the same code; the live overlay beside the SCADA display needs a replica and an on-premises bench.

First proof

The experiment
Replay one month of an anonymised alarm-log export through the flood finder (count, duration, peak rate, decay after rationalisation) and the monthly point review; compare flood counts and peak rates with the operator's own KPI report. No connection, no write access. In parallel, the public-data demo on the simulated 20 km line (one straight line, one product, no branches, no batches, no gas; 12,800 simulated scenarios): pressure drop at 02:14, pump trip at 02:31, delivery at risk by 03:01, decided with context, receipts and a dry-run dispatch. The reel on the site today is the telecom session; the oil re-cut is pending.
Also
Alarm — One alarm. The whole context. · OOH